PROJECTS

Client : Konya Metropolitan Municipality, Turkey
Period : 2022

Assignment Title: Consultancy Services for Preparation of the Technical Feasibility Study of Public Transport Capacity Development under Japan International Cooperation Agency – Improving the Mass Transport Capacity Project.

The overall objective is to carry out a detailed assessment to determine the overall feasibility of implementing the project financed under Japan International Cooperation Agency funds.

Client : ALDAŞ, JSC, Turkey
Period : 2022

Assignment Title: Döşemealtı-Kepez-Aksu Districts Sewerage Network Project with the partnership of Özge Project Engineering, LC, TURKEY

Client: General Directorate of Trabzon Water and Sewerage Administration, TURKEY
Period: 2022

Assignment Title: Ortahisar (TRABZON) Wastewater Treatment Plant Project Pre-feasibility Report

The specific purpose of this pre-feasibility report is to make option analysis, technical, economic and financial analyzes related to the wastewater treatment plant.

Client : ILBANK, JSC / TURKEY
Period : 2022

Assignment Title: Preparation of Energy Efficiency Guidelines for Local Authorities

by the sub-contractor agreement signed with Alter, LC / TURKEY
Client : General Directorate of Adana Water and Sewerage Administration, TURKEY
Period : 2021-2025
Location : Adana / TURKEY

Assignment Title: Assignment Title: Consultancy Services and Construction Supervision for Adana Kozan İmamoğlu Yedigöze Water Supply Transmission Line, Yedigöze Water Treatment Plant, Kozan Water Network and Pınargözü Transmission Line Projects

The overall objective is to carry out a detailed design review, preparation of bidding documents, provision of Technical Assistance during the bidding process and supervision of construction, and rehabilitation works for the below environmental infrastructure investments constitute the scope of

Services of this Contract in general:

• İmamoğlu Yedigöze Water Supply Transmission Line
• Yedigöze Water Treatment Plant
• Kozan Water Network and Pınargözü Transmission Line

Client : Konya Metropolitan Municipality, Turkey
Period : 2021-2022

Assignment Title: Consultancy Services for Preparation of the Technical Feasibility Studies under Japan International Cooperation Agency funds.
The overall objective is to carry out a detailed assessment to determine the overall feasibility of implementing the sub-projects listed below financed under Japan International Cooperation Agency funds.

Also, the Environmental Management Studies and the Environmental Monitoring Lists are prepared within the scope of the Consultancy Agreement.

• Aslim Street Grade-Separated Junction Project
• Fırat Street Grade-Separated Junction Project
• Adana Beltway – Kanal Street Grade-Separated Junction Project
• Sedirler Street Grade-Separated Junction Project

with the partnership of Sedes Engineering, LC
Client : ILBANK, JSC / TURKEY
Period : 2021 – 2022

Assignment Title: Consultancy Services for Preparation of Technical Feasibility Studies under Sustainable Cities Project II- Additional Financing (SCP-II AF) – Group-5The overall objective is to carry out a detailed assessment to determine the overall feasibility of implementing the sub-projects financed under Sustainable Cities Project II-Additional Finance.

The specific objective of this assignment is to appraise the development of the sub-projects listed below through the Consultant’s preparation of a Technical Feasibility Study with Economic and Financial Analysis.

• Merzifon (Amasya) Pressurized Water Transmission Line, Water Network, Reservoir Construction and Installation of Automation System
• Rize Water Transmission Line and Network Project
• Çarşamba (Samsun) Drinking Water, Sewerage and Storm Water Network Project
• Sinop Water Network Project
• Sinop Sewerage and Storm Water Network Project
• Türkeli (Sinop) Water Network Project
• Niksar (Tokat) Water Network & Çamiçi Plateau Water Treatment Plant and Water Network Project
• Kemerhisar (Niğde) Water Network Project
• Yerköy (Yozgat) 2. Stage Sewerage and Transmission Line Project

Client : Urfa Metropolitan Municipality, Turkey
Period : 2021-2022

Assignment Title: Consultancy Services for Preparation of the Technical Feasibility Study of  Public Transport Capacity Development under Japan International Cooperation Agency – Improving the Mass Transport Capacity Project.

The overall objective is to carry out a detailed assessment to determine the overall feasibility of implementing the project financed under Japan International Cooperation Agency funds.

Client : Urfa Metropolitan Municipality, Turkey
Period : 2021-2022

Assignment Title: Consultancy Services for Preparation of the Technical Feasibility Study of Fire Department Capacity Development under Japan International Cooperation Agency – Improving Firefighting Services Project.

The overall objective is to carry out a detailed assessment to determine the overall feasibility of implementing the project financed under Japan International Cooperation Agency funds.

Client : ILBANK, JSC / TURKEY
Period : 2020-2021

Assignment Title: Consultancy Services for Preparation of the Inception report to measure ILBANK’s contribution to sustainable development goals.

Client : ILBANK, JSC / TURKEY
Period : 2019-2020

Assignment Title: Assignment Title: Consultancy Services for Preparation of Credibility Analysis under the EU Facility for Refugees in Turkey.

The overall objective is to carry out a detailed assessment to determine the overall credibility of the beneficiaries listed below implementing the sub-projects financed under the EU Facility for Refugees in Turkey.

• General Directorate of Kayseri Water and Sewerage Administration
• General Directorate of Adana Water and Sewerage Administration
• General Directorate of Kahramanmaraş Water and Sewerage Administration
• Kahramanmaraş Metropolitan Municipality
• Osmaniye Municipality

by the sub-contractor agreement signed with Sedes Engineering, LC / TURKEYClient : ILBANK, JSC / TURKEY
Period : 2018-2019

Assignment Title: Consultancy Services for Preparation of Technical Feasibility Study of Elbistan (Kahramanmaraş) Water Network Project.The overall objective is to carry out a detailed assessment to determine the overall feasibility of implementing the projects financed under The EU Facility for Refugees in Turkey.

The specific objective of this assignment is to appraise the development of the project through the Consultant’s preparation of a Technical Feasibility Study with Economic and Financial Analysis.

Also, the Environmental Management Studies and the Environmental Monitoring Lists are prepared within the scope of the Consultancy Agreement.

Client : ILBANK, JSC / TURKEY
Period : 2018-2019

Assignment Title: Consultancy Services for Preparation of Technical Feasibility Study of Elbistan (Kahramanmaraş) Water Transmission Line Project.The overall objective is to carry out a detailed assessment to determine the overall feasibility of implementing the projects financed under the EU Facility for Refugees in Turkey.

The specific objective of this assignment is to appraise the development of the project through the Consultant’s preparation of a Technical Feasibility Study with Economic and Financial Analysis.

Client : ILBANK, JSC / TURKEY
Period : 2018-2019

Assignment Title: Consultancy Services for Preparation of Technical Feasibility Study of Kayseri 2nd Stage Wastewater Treatment Plant Project.
The overall objective is to carry out a detailed assessment to determine the overall feasibility of implementing the projects financed under the EU Facility for Refugees in Turkey.

The specific objective of this assignment is to appraise the development of the project through the Consultant’s preparation of a Technical Feasibility Study with Economic and Financial Analysis.

by the expert agreement signed with Eptisa, LC / TURKEY
Client : General Directorate of EU and Foreign Relations, Ministry of Environment, Urbanization and Climate Change / TURKEY
Period : 2021-2024
Location : Rize / TURKEY

Assignment Title : Construction supervision service of Rize Wastewater Project

Client : ILBANK JSC / TURKEY
Period : 1998-2007
Location : Amasya, Ordu, Samsun and Sinop Provinces / TURKEY

Assignment Title : Construction supervision, commissioning and start-up services of the sub-projects listed below:

• Çaydibi District (Amasya) Water Transmission Line and Water Network Project
• Destek District (Amasya) Water Transmission Line and Water Network Project
• Taşova District (Amasya) Water Transmission Line and Water Network Project
• İkizpınar District (Samsun) Water Transmission Line and Water Network Project
• Aybastı District (Ordu) Water Treatment Plant, Transmission Line and Water Network Project
• Korgan District (Ordu) Water Treatment Plant, Transmission Line and Water Network Project
• Ordu Water Treatment Plant Project
• Gülyalı District (Ordu) Water Transmission Line and Water Network Project
• İkizce District (Ordu) Water Treatment Plant, Transmission Line and Water Network Project
• Ilıca-Yalıköy Districts (Ordu) Water Treatment Plant, Transmission Line and Water Network Project
• Ordu Water Transmission Line and Water Network Project
• Gümüşhacıköy District (Amasya) Water Transmission Line and Water Network Project
• Suluova District (Amasya) Water Transmission Line and Water Network Project
• Merzifon District (Amasya) Sewerage Network Project
• Havza District (Samsun) Water Transmission Line and Water Network Project
• Şenbolluk District (Ordu) Water Treatment Plant, Transmission Line and Water Network Project
• Erfelek District (Sinop) Water Transmission Line and Water Network Project
• Ayancık District (Sinop) Water Transmission Line and Water Network Project
• Alaçam District (Samsun) Sewerage Network Project
• Ondokuzmayıs District (Samsun) Sewerage Network Project
• Samsun Sewerage Network Project

by the agreement signed with Yapısu-Lima Group JV / TURKEY
Client : ILBANK JSC / TURKEY
Period : 2021-2023
Location : Kırıkkale / TURKEY

Assignment Title : Construction Management Services of Çerikli District (Kırıkkale) Water Transmission Line and Water Network Project

by the agreement signed with Yapısu-Lima Group JV / TURKEY
Client : ILBANK JSC / TURKEY
Period : 2018-2020
Location : Çorum / TURKEY

Assignment Title : Construction Management Services of Mecitözü District (Çorum) Water Network Project

by the agreement signed with Yapısu-Lima Group JV / TURKEY
Client : Çorum Special Provincial Administration / TURKEY
Period : 2018-2020
Location : Çorum / TURKEY

Assignment Title : Construction Management Services of Şendere Pond Drinking Water System Project

The project includes the treatment of the water taken from Şendere Pond and the drinking water transmission lines to 54 villages and the construction of the reservoirs of the villages.

Our service include;
– the construction management of water treatment plant, water transmission lines and water reservoirs of 54 villages.
– the commissioning and the start-up work of the treatment plant.

by the agreement signed with Yapısu-Lima Group JV / TURKEY
Client : General Directorate of Samsun Water and Sewerage Administration / TURKEY
Period : 2017-2019
Location : Samsun / TURKEY

Assignment Title : Construction Management Services of the Drinking Water Network Project of Ardıç, Başalan, Çarşıköy, Gültepe, Güzelyurt and Uğurlu Regions of Ayvacık District

by the agreement signed with Yapısu JSC / TURKEY
Client : ILBANK JSC / TURKEY
Period : 2017-2018
Location : Amasya / TURKEY

Assignment Title : Construction Management Services of Amasya Storm Water Lines

by the agreement signed with Lima Group, LC / TURKEY
Client : Ondokuzmayıs University / TURKEY
Period : 2017-2018
Location : Samsun / TURKEY

Assignment Title : Construction Management Services of Ondokuzmayıs Universıty Sewerage Network Project

Our service includes the construction management of the sewerage system of Ondokuzmayıs University main campus.

by the agreement signed with Yapısu-Lima Group JV / TURKEY
Client : General Directorate of State Hydraulic Works / TURKEY
Period : 2016-2017
Location : Amasya / TURKEY

Assignment Title : Construction Management Services of Kagni River Flood Control Project

by the agreement signed with Lima Group, LC / TURKEY
Client : General Directorate of Samsun Water and Sewerage Administration / TURKEY
Period : 2015-2016
Location : Samsun / TURKEY

Assignment Title : Construction Management Services of the Drinking Water Network Project of Tefekli-Taşkelik-Sancar-Yenice-Zeytin-Karlı-Sarılık Regions of Alaçam District

by the agreement signed with Lima Group, LC / TURKEY
Client : General Directorate of Samsun Water and Sewerage Administration / TURKEY
Period : 2015-2016
Location : Samsun / TURKEY

Assignment Title : Construction Management Services of the Drinking Water Network Project of Yakakent District

by theagreement signed with Yapısu JSC / TURKEY
Client : ILBANK JSC / TURKEY
Period : 2015-2016
Location : Sinop / TURKEY

Assignment Title : Construction Management Services of Türkeli (Sinop) Sewerage Project

by the agreement signed with Lima Group, LC / TURKEY
Client : General Directorate of Samsun Water and Sewerage Administration / TURKEY
Period : 2014-2015
Location : Samsun / TURKEY

Assignment Title : Construction Management Services of Ondokuzmayıs University Drinking Water Transmission Line Project

by the agreement signed with Ecetaş, JSC / TURKEY
Client : General Directorate of EU and Foreign Relations, Ministry of Environment, Urbanization and Climate Change / TURKEY
Period : 2013-2015
Location : Amasya / TURKEY

Assignment Title :Wastewater Treatment Plant and Water & Wastewater Network Project

Multi-annual operational program “Environment” for Community assistance from the Instrument of Pre-Accession Assistance (IPA) for the Regional Development Component in Turkey.

This contract, which was implemented as per FIDIC Red Book, consists of the wastewater treatment plant, the extension of the sewerage network, and provision of the new wastewater connections for customers as well as replacement and rehabilitation of the main inceptor sewer.

Our service include;
– the construction management,
– the commissioning and the start-up work of the treatment plant,
– the trial operation of the treatment plant for 3 months.

by the agreement signed with Ecetaş, JSC / TURKEY
Client : General Directorate of State Hydraulic Works / TURKEY
Period : 2013-2014
Location : Antalya / TURKEY

Assignment Title : Construction Management Services of Karacaören II Dam Water Transmission Line Project

by the agreement signed with Yapısu-Lima Group JV / TURKEY
Client : ILBANK JSC / TURKEY
Period : 2012-2013
Location : Samsun / TURKEY

Assignment Title : Construction Management Services of Hüseyinmescit District (Samsun) Sewage Network Project

by the agreement signed with Cem-Sel, LC / TURKEY
Client : Elbistan Municipality / TURKEY
Period : 2009-2011
Location : Kahramanmaraş / TURKEY

Assignment Title :

Construction Management Services of the Rehabilitation of Drinking Water Network, Reservoirs and Pumping Stations of Elbistan District

The overall objective is to carry out the construction management works of the project financed under Municipal Services Program-World Bank.

by the agreement signed with Cem-Sel, LC / TURKEY
Client : General Directorate of State Hydraulic Works / TURKEY
Period : 2008-2010
Location : Adıyaman / TURKEY

Assignment Title : Construction Management Services of Adıyaman Water Transmission Line Project

by the agreement signed with Cem-Sel, LC / TURKEY
Client : ILBANK JSC / TURKEY
Period : 2007-2008
Location : Erzincan / TURKEY

Assignment Title : Construction Management Services of İliç District (Erzincan) Water Transmision Line Project

by the agreement signed with Artes, JSC / TURKEY
Client : Blue Stream Pipeline B.V.
Period : 2000-2002
Location : Çarşamba – Samsun / TURKEY

Assignment Title : Construction Management Services of Russia-Turkey Natural Gas Pipeline Sea – Land Connection Works

Blue Stream is a major trans-Black Sea gas pipeline that carries natural gas from Russia into Turkey. The pipeline has been constructed by the Blue Stream Pipeline B.V., the Netherlands based joint venture of Russian Gazprom and Italian Eni. The Blue Stream Pipeline B.V. is an owner of the subsea section of pipeline, including Beregovaya compressor station, while Gazprom owns and operates the Russian land section of the pipeline and the Turkish land section is owned and operated by the Turkish energy company BOTAŞ. According to Gazprom the pipeline was built with the intent of diversifying Russian gas delivery routes to Turkey and avoiding third countries.

Land Connection Works of the Blue Stream at Çarşamba district in Samsun/Turkey was constructed by Artes Construction, JSC. Prolima served to Artes Construction JSC for the construction management of the project.

Client : Lima Group LC / TURKEY
Period : 2019-2021
Location : Samsun / TURKEY

Assignment Title : Design and Build Services of Residence Project.

Services for all design and construction work required to complete the project.

Client : ELA-EGE LC / TURKEY
Period : 2014-2015
Location : Samsun / TURKEY

Assignment Title : Design and Build Services of Residence Project.

Services for all design and construction work required to complete the project.

Client : Bafra Municipality / TURKEY
Period : 2010-2011
Location : Bafra – Samsun / TURKEY

Assignment Title : Design and Build Services of Water Transmission Line Bridge Crossing Project.

Services for all design and construction work required to complete the project.